Georgia

DMCA 14A Front Dike Revetment Repair

2019

The project consisted of the repair of the erosion embankment along the Savannah River Navigation Channel shoreline. This included the installation of a 600 FT rock revetment along shoreline of dredged material containment area 14A using 2.175 tons of bedding stone, 2700 tons of intermediate stone, and 7,500 tons of armor stone.

Continental Heavy Civil

13131 SW 132nd Street, Suite 102
Miami, FL 33186
E: office@chcivil.com

P: 786-250-5851
F: 305-357-6984

© 2019 by Continental Heavy Civil

P1044441